Utility Sector Compliance-Audited UV-Cured CIPP Lining Test Record
1. Record Metadata
UV Test Record ID (GUID)
Compliance Standard Version
2. Regulatory Compliance Framework
Utility Provider
Regulatory Body
Environmental Permit Ref
Drinking Water Inspectorate (DWI) Approved (Check if potable mains)
3. Project & Site Identification
Contract Reference
Site Location Description
Asset Type
Foul Sewer
Surface Water Sewer
Combined Sewer
Potable Water Main
Raw Water Duct
Upstream Manhole / Chamber
Downstream Manhole / Chamber
Nominal Diameter (mm)
Contracted Length (m)
4. Material Batch & Shelf Life Compliance
Liner Manufacturer
Resin System Type
Resin Batch Number
Wall Thickness Design (mm)
Manufacturing Date
Shelf Life Expiry Date
Storage Temp Compliant
Chain of Custody Verified
5. Calibration & HSEQ Verification
UV Sensor Calibration Cert #
Pressure Gauge Calibration Expiry
Toolbox Talk Conducted
Confined Space Permit Issued
Competency Certs Verified
6. Curing Operational Parameters
UV Rig Unit ID
Light Train Model & Lamps
Initial Inflation Pressure (bar)
Final Inflation Pressure (bar)
Winch Pull Speed Range (m/min)
Total Cure Time (Minutes)
Ambient Site Temp (°C)
Peak Exotherm Temp (°C)
Max Allowed Exotherm Temp (°C)
7. Real-Time Curing Telemetry (Sample Row)
Distance (m)
Pull Speed (m/min)
Lamp Intensity (%)
Internal Pressure (bar)
8. Quality Control & Physical Testing
Visual Inspection Post-Cure Status
Pass - Uniform Glossy Finish
Conditional Pass - Minor Wrinkles
Fail - Delamination/Dry Spot
Barcol Hardness Test Result (>40)
Initial Ring Sample Test Status
Sample Taken & Sent to UKAS Lab
Not Required by Contract Spec
Failed Lab Analysis
Measured Wall Thickness Compliance (mm)
CCTV Post Inspection Status
Accepted
Rejected
Pending Remedial Grinding/Cutting
9. Media & Evidence Uploads
Curing Data Graph URI
Photo Evidence Category
Pre-Installation Defect / Cleanliness Check
Liner Insertion & Packer Launch Setup
Resin Batch & Calibration Label Verification
Post-Cure Upstream Termination Cut & Inspect
Post-Cure Downstream Termination Cut & Inspect
Post-Cure CCTV View of Liner Interior Surface
Barcol Hardness Meter Reading Display
Attach Photo / Inspection Capture
10. Multi-Party Compliance Sign-Off
Contractor Supervisor Name
Contractor Competency Cert
Utility Client Representative Name
Utility Client Job Title
Final Compliance Acceptance Status
Approved for Service
Approved with Snags
Rejected - Remedial Work Ordered
Supervisor Signature
Draw Signature
Clear Signature
Save Test Record (Online / Offline Support)